The charger will include a big battery for when the sun shines and the wind blows.
What? No, the vast majority of charge points are just plugged into the grid.
The choice of real estate, what site work is involved and what other electric stuff can be bundled in the contract. If I interpret your statement as intended.
Around here the wires are overhead.
...The real estate is already there, in the form of 'parking places' which outnumber the square footage and in many case the per unit of housing and sometimes all buildings.
The big cost is getting the capacity from the utility (which isn't cheap to get a drop from wires, overhead or not) and then installing the wiring to plug the charger into. The charger itself is like a low-end electric stove in both cost and power consumption. And that won't really change, because our electrical grid is not going to change how they deliver power any time soon.
DC fast charging requires a completely different system of transformers and capacitance to get the specific voltage and impulse required - but there will always be lower voltage devices because they will always be cheaper to build. So DC charging infrastructure shouldn't negate building out support for 6kw charging. Even if we get a true DC standard, there will always be cheaper, shorter range vehicles that need it from scoots to motorcycles.
-Crissa
I will try again
The title here is rethinking the charge. You stated wiring to the box more than charger. You stated this will not change or close to that.
Pertaining to this will not change was the part about chargers having batteries. I see in videos on line what appear to be convience stores in England Or great britian with chargers for vehicles in the parking lot and large transformer type things nearby that are batteries that get charged of the grid and feed the vehicles. What burned (first) in the electric road racing incident where a bunch of race bikes were lost was the battery to charge the bikes off of, at leas that is what I understand.
Pertaining the cost of wiring exceeding cost of the charger. I kind of thought you would be referencing the cost of Harley Davidson dealerships getting their two or ccs devices up and running. I was more looking it in terms of actually buying a piece of property and setting up charging stations to turn a profit. In order to do this a business plan could be to buy the energy through a timed meter in the off peak. If nuclear is really the future it will be the opposite of peaker type generation. I only typed sun shine and wind blow.
Now what is a charger? The FX accessory charger costs $600 and is not close to maxing out a 15 amp 120volt circuit. Alta had two choices of charger probably somewhere around half the capacity of an electric clothes dryer socket. Perhaps $1000. Digi now was approx $2000. Charge tank is about $2000 that is a charger and for SRF need premium or else more $. All these things are more than the cost of socket for such assuming put in contract for new house. Even if upgrading from 60 amp service to 200 amp or 200 amp to 400 amp should be under the $2000 if you call the outfit that advertises on cable tv or the neighbor's sister's husbband who recomends some entity which in my case ended up being an outfit with at least two A's at the front of their business name.
I guess you had a type two set up in mind not what I have discussed. I just went by the town hall for Stafford Springs, or maybe Stafford CT which is the only charger I go by in my travels. Here are a few pictures, it would appear involves a solar roof to some degree. The two chargers near the building with conduit coming out of the building I could not figure out how to pull out the cord, the other two, one in use and the other that apparently does not retract. I imagine this could be a problem if you find a location on the smart phone but can't pull out the cord. The pavement has been cut to the roof assembly from the building. I wonder if it costs more to wire or the actual things I assume you consider a charger or the wiring into the building costs more. It might all be covered in some of the six or so little fees on the electric bill after supply and transmission. The towns do lately like to hire 3 part time retired guys instead of one full time guy. I was just talking to a member of the bike club while not an electrician same general idea part time on call.
There is a portable no grid at all system that pops up as I wander the internet, it has two 6kw stations and a bunch of solar panels. I would imagine it pops up for lots of folks or perhaps is just advertising and pops up is kind of misleading.
Fran