it might even make the hair stand up on your arms, right before the magic smoke comes rushing out to let you know that you just found the surprise unadvertised fireworks display in your bike !
still on the trucks trains etc that's the equivalent of 6 huge viking head connectors that weigh about 25 lbs each head, the cable is about 9 to 12lb per foot, well actually being high voltage probably more, and the insulation on kv class tends to be very stiff too, at least if you want any durability out of it. plugging in and out, fun, and that's an entire new class of power handling once you get into that range. any fuckup there is catastrophic, not just burnt batteries, but arc blast that'll blow arms and legs off.
probably plug it in, everyone runs and hides behind the concrete blast wall then pusht he button to roll in the hv switch. they could probably power it with a 4160 feed but just the amps needed, thats still huge, much better feeding it with a 36.8 or if you got a few see if you can get a transmission drop and hit a 69k to feed it.
thats just not power you can just, throw another plug in, that needs to be planned and scheduled when putting that in, and depending on your local grid, a small municipality might even want that to be dispatched.
we have a steel mill out here, their main cooker pulls 50mw when they throw that switch on, now couple that with the stupid solar farm on a windy / cloudy day and that bitch is swinging 50 mw in a few seconds..yah the dispatchers gonna have a lot of fun heh
aaron