I see on Plugshare that they just added another CCS / CHAdeMO charge station where NOT needed on I-80.
The East Bound Donner Summit Rest Area.
This must be a CA thing to have countless chargers where they are not needed and none where they are needed. Still no J1772 there.
IMO, they should add a J1772 at every fast charge station. The 240VAC is already there, so why not? At least have a 240 VAC outlet!
I could name places all day where we need charge stations, even on I-80, just not in CA. How about LoveLock, NV for an example?
Between here in Auburn, CA and my main Reno home, there are now 13 different exits where I can DC fast (24KW) charge in that 99.0 miles (160 KM). But only a few J1772 stations--and those can charge ALL EVs, albeit slow at 6.6 to 7.7 KW max AC capacity.
I really only need one location. The one at Cisco Grove is my favorite, right in the middle and near the summit and can also be used for taking Hwy 20. And there are three J-1772 ports there, two at 6.6 KW and the other at 7.680 KW (32 amps at 240 VAC). The new ChargePoints are LOWER capacity then the old Clipper Creek behind the gas station. But the two CP's are NOT split so both ports can be used and get the full 13.2 KW (also pay double). The old Clipper Creek is a flat fee of $2.00 and is a better deal in every way, especially when under the 7.680 (32 amp) rating.
Who makes these stupid decisions of where to put the new charge stations?
-Don- Auburn, CA