Man, going over I-80 on a motorcycle x-x sounds so terrible.-Crissa
I've taken Hwy 20 so many times lately, I am now considering taking I-80 tomorrow and stopping to charge at the Nyack Road Shell just so I can check-in and take photos of my Energica charging for PlugShare. I have charged there so many times in the last year, that it really surprises me that I never bothered to check-in and post the photos. So I will do it tomorrow.
I will also check to see if the new chargers at the Cisco Grove Chevron Station are now activated. There, I have a check-in, and photos of my Zero SR, charging from the old J-1772 at 6.4 KW. Also photos of the two new DC chargers and the new J-1772 charge station. So now there are two J-1772s at Cisco Grove. One old Clipper Creek and the other new one is ChargePoint. But all the ChargePoints had no power the other day when I was there last, so they have not (then) been activated. They have only been there for around a week. Perhaps they are now activated.
All the new stuff there is Chargepoint, including the two new CCS and CHAdeMO
as shown here in my photos. You have to look for the J-1772's (green) there to see my photos, as PlugShare has no idea the DC fast chargers (should be orange) there exist.
They also recently moved the CCS chargers by the Save-Mart, so I want to check that out as well. I just now rechecked. It looks like they
added chargers there , were not moved. But added to the front of the Save-Mart where the old ones were hidden behind the store. I will have to check that out tomorrow as well.
Again, grouped together where not really needed.
-Don- Auburn, CA