Just spent 12 hours getting the bike ready. I had to figure out how the chargetank bracket kit installs, which I have it mounted securely now but it's not certain if I did it correctly. Removing the tank lock and installing the bracket requires some tools in really tight spaces, also later figuring out after the fact that I could remove one of the bolts for the ABS module and rotate the brake lines with it out of the way. I installed a 3'ft right-angled C13 cord semi-permanently under the left side lower plastics and routed up into the SCv2 area so it will always be plugged in. I removed the rubber boot covers for the C13 receptacle on the bike and also the SBX app connector for the aux charger. I cleaned up the SCv2 routing a lot. Going to ask for the day off and do some more route planning.
I tried taking pictures and I got some, but not all, of the shots that I wanted to take. The camera phone is not easy to work with it was shutting off randomly in the cold. Also the lighting wasn't much good and varied a lot.
SCv2 with onboard is a minimum requirement for me to be able to make this trip so there's that. Also I think a used aerostich roadcrafter suit arrives in the mail tomorrow - hope it fits!